The Do-It-Yourself (DIY) CoverLine illuminate KIT combines our powerful CoverLine
aluminum profile with one of the
15cm long stripe pcbs with 21x Samsung COMPACT LM301 LEDs
(available in different colored light temperatures).
This DIY-KIT contains all components to build a 15cm high-performance LED light with little effort. You only need a sufficiently dimensioned power supply, depending on the number of lights that are to be operated.
The included high-performance LED strip can be operated from 100mA to 1400mA. This results in a power consumption of 0.8W - 13W per lamp.
If you have any further questions, we would be happy to help you plan your individual project. Please contact our support.
Heat management
Applications with high power LEDs need enduring, adequate and plane
heat conduction from the first moment of use. It is very important and
neccessary to get the heat off the devices to ensure the maximum light
output, lifetime and efficiancy.
Drive management
LEDs should be run with a constant current in addition to the
manufacturers recommendations. To ensure this we recommend to take
constant current power supplies because resistors are always a risk
factor in high power LED applications.
IP protection
Unless otherwise stated, the modules are not protected against high humidity or splashing water. If LEDs are used in areas that require increased protection, this must be manufactured according to the requirements.
EMC protection
LEDs are sensitive against heat and electric charge. Please avoid any
kind of short circuits or electric discharge to the illuminant. The chip
can be damaged or even destroyed.
Storage / JEDEC level
The storage temperature should be from -30°C up to + 80°C in dry
ambience. After opening a sealed bag the content should be mounted
rapidly. Once absorbed humidity can be removed by tempering the LEDs in
some cases. More information can be found in the manufacturers
datasheets or on the manufacturer homepages.
Soldering conditions
Each LED has its own soldering conditions that the user should pay
attention to. After the launched lead free processing specifications
many standarts have changed. Information about recommended soldering can
be found in the manufacturers datasheets or on the manufacturer
homepages.
Delivery time
Deliveries within Germany take 2-3 days beginning after receipt of payment, for deliveries to invoice beginning with the shipment, for deliveries to cash on delivery beginning with receipt of order. Payments and incoming orders beyond our business hours let the delivery time begin with the next workday. For deliveries to other EU countries the delivery time may be extended up to 3 weeks. The delivery time is subject to the proper delivery of the logistics company, as far as delivery delays are not caused by us. The validity of the above delivery times requires the availability of the ordered goods from stock at the time the delivery time is beginning.