×
Facebook Messenger

Chat with us!

You agree that data will be send to Facebook


Privacy statement
   

DIY CoverLine mini-illuminate KIT 2200K LM301B (black)

Varianten

UVP 18,90 €

Amount Netto Brutto
from 1 14,20 € 16,90 €
Prices plus shipping costs

Part number:
LT-5460



Target country of delivery

Amount

Technical Data

Unit Value
Light color warm-white
Housing Color white
Beam 120°
Length 249.0mm
Operating temperature -40 ~ +85
 
Unit min. typ. max.
Lumen 151lm 1014lm 1910lm
PPF 2.36µMol/s 15.72µMol/s 29.46µMol/s
Kelvin 2200K
CRI 80
Voltage 7.80V 8.32V 8.71V
Current 100mA 700mA 1400mA

Downloads

Datasheet 2.56 MB
RoHS 444.37 KB
REACH 303.65 KB
Chemical Compatibility 723.42 KB

Description

The Do-It-Yourself (DIY) CoverLine illuminate KIT combines our powerful CoverLine aluminum profile with one of the 25cm long stripe pcbs with 21x Samsung LM301 LEDs (available in different colored light temperatures).

This DIY-KIT contains all components to build a 25cm high-performance LED light with little effort. You only need a sufficiently dimensioned power supply, depending on the number of lights that are to be operated.

The included high-performance LED strip can be operated from 100mA to 1400mA. This results in a power consumption of 0.8W - 13W per lamp.

If you have any further questions, we would be happy to help you plan your individual project. Please contact our support.

Scope of delivery:

1x LT-5449 CoverLine Aluminium LED Profile 25cm (without Cover)
1x LT-3379 Heat Conductive Pad for 21x Samsung LM301B stripes
1x LT-5447 CoverLine V2 acrylic cover 25cm
2x LT-4531 CoverLine V2 end cap flat 3D printing with cable entry black
1x LT-3101 Core conductor rigid 0,5mm² 50cm red
1x LT-3102 Core conductor rigid 0,5mm² 50cm black
1x 25cm Stripe with 21x Samsung LM301 LEDs in selected light color

Current Voltage Power
100 mA
7,80 V
0,780 W
350 mA8,07 V2,825 W
700 mA 8,32 V 5,824 W
1050 mA 8,53 V 8,957 W
1400 mA
8,71 V12,194 W
Current Lumen Lumen/W
100 mA
151 lm193,85 lm/W
350 mA
523 lm185,45 lm/W
700 mA 1014 lm 174,11 lm/W
1050 mA
1475 lm164,68 lm/W
1400 mA
1910 lm
156,63 lm/W
Current µMol/s µMol/joule
100 mA
2,36
3,03
350 mA
8,15
2,89
700 mA 15,72
2,70
1050 mA
22,80
2,55
1400mA
29,46
2,42

Successful usage of high power LEDs:

Heat management
Applications with high power LEDs need enduring, adequate and plane heat conduction from the first moment of use. It is very important and neccessary to get the heat off the devices to ensure the maximum light output, lifetime and efficiancy.

Drive management
LEDs should be run with a constant current in addition to the manufacturers recommendations. To ensure this we recommend to take constant current power supplies because resistors are always a risk factor in high power LED applications.

IP protection
Unless otherwise stated, the modules are not protected against high humidity or splashing water. If LEDs are used in areas that require increased protection, this must be manufactured according to the requirements.

EMC protection
LEDs are sensitive against heat and electric charge. Please avoid any kind of short circuits or electric discharge to the illuminant. The chip can be damaged or even destroyed.

Storage / JEDEC level
The storage temperature should be from -30°C up to + 80°C in dry ambience. After opening a sealed bag the content should be mounted rapidly. Once absorbed humidity can be removed by tempering the LEDs in some cases. More information can be found in the manufacturers datasheets or on the manufacturer homepages.

Soldering conditions
Each LED has its own soldering conditions that the user should pay attention to. After the launched lead free processing specifications many standarts have changed. Information about recommended soldering can be found in the manufacturers datasheets or on the manufacturer homepages.


Delivery time

Deliveries within Germany take 2-3 days beginning after receipt of payment, for deliveries to invoice beginning with the shipment, for deliveries to cash on delivery beginning with receipt of order. Payments and incoming orders beyond our business hours let the delivery time begin with the next workday. For deliveries to other EU countries the delivery time may be extended up to 3 weeks. The delivery time is subject to the proper delivery of the logistics company, as far as delivery delays are not caused by us. The validity of the above delivery times requires the availability of the ordered goods from stock at the time the delivery time is beginning.