×
Facebook Messenger

Chat with us!

You agree that data will be send to Facebook


Privacy statement
   

DIY CoverLine illuminate KIT 5000K (silver)

50cm aluminium + LED module

Varianten

UVP 34,73 €

Amount Netto Brutto
from 1 25,13 € 29,90 €
Prices plus shipping costs

Part number:
LT-4578



Target country of delivery

Amount

Technical Data

Unit Value
Light color white
Beam 120°
Height 27mm
Width 40mm
Length 505mm
 
Unit min. typ. max.
Lumen 1384lm 5671lm 7381lm
PPF 18.98µMol/s 77.81µMol/s 101.37µMol/s
Kelvin 5000K
Voltage 18.62V 19.62V 19.88V
Current 350mA 1500mA 2000mA

Downloads

RoHS 444.37 KB
REACH 303.65 KB
Chemical Compatibility 723.42 KB

Description

The Do-It-Yourself (DIY) CoverLine illuminate KIT combines our powerful CoverLine aluminum profile with one of the strongest LED stripes, the 50cm aluminum strip with 98x Samsung LM301B LEDs (available in different colored light temperatures).

This DIY-KIT contains all components to build a 50cm high-performance LED light with little effort. You only need a sufficiently dimensioned power supply, depending on the number of lights that are to be operated.

The included high-performance LED strip can be operated from 350mA to 2800mA. This results in a power consumption of 6.4W - 56.1W per lamp.

If you have any further questions, we would be happy to help you plan your individual project. Please contact our support.

Scope of delivery:

1x LT-3081 CoverLine Aluminium LED Profile 50cm (without Cover)
1x LT-3990 Wärmeleitklebepad für 50cm Streifenplatinen
1x LT-4567 CoverLine V2 acrylic cover 50cm
1x LT-4511 CoverLine V2 end cap flat 3D printing closed silverr
1x LT-4512 CoverLine V2 end cap flat 3D printing with cable entry silver
1x LT-4513 CoverLine V2 downholder 3D printing silver
2x LT-0315 Double strand cable 0.75mm², white
1x LT-3760 50cm Alustripe with 98x Samsung LM301B LEDs 5000k

Successful usage of high power LEDs:

Heat management
Applications with high power LEDs need enduring, adequate and plane heat conduction from the first moment of use. It is very important and neccessary to get the heat off the devices to ensure the maximum light output, lifetime and efficiancy.

Drive management
LEDs should be run with a constant current in addition to the manufacturers recommendations. To ensure this we recommend to take constant current power supplies because resistors are always a risk factor in high power LED applications.

IP protection
Unless otherwise stated, the modules are not protected against high humidity or splashing water. If LEDs are used in areas that require increased protection, this must be manufactured according to the requirements.

EMC protection
LEDs are sensitive against heat and electric charge. Please avoid any kind of short circuits or electric discharge to the illuminant. The chip can be damaged or even destroyed.

Storage / JEDEC level
The storage temperature should be from -30°C up to + 80°C in dry ambience. After opening a sealed bag the content should be mounted rapidly. Once absorbed humidity can be removed by tempering the LEDs in some cases. More information can be found in the manufacturers datasheets or on the manufacturer homepages.

Soldering conditions
Each LED has its own soldering conditions that the user should pay attention to. After the launched lead free processing specifications many standarts have changed. Information about recommended soldering can be found in the manufacturers datasheets or on the manufacturer homepages.

Delivery time

Deliveries within Germany take 2-3 days beginning after receipt of payment, for deliveries to invoice beginning with the shipment, for deliveries to cash on delivery beginning with receipt of order. Payments and incoming orders beyond our business hours let the delivery time begin with the next workday. For deliveries to other EU countries the delivery time may be extended up to 3 weeks. The delivery time is subject to the proper delivery of the logistics company, as far as delivery delays are not caused by us. The validity of the above delivery times requires the availability of the ordered goods from stock at the time the delivery time is beginning.