×
Facebook Messenger

Chat with us!

You agree that data will be send to Facebook


Privacy statement
    Netzteile   >   Power Supply MeanWell 27V / 2.8A / 75W with PFC

Power Supply MeanWell 27V / 2.8A / 75W with PFC

High end power supply for big LED/CCFL applications


UVP 58,90 €

Amount Netto Brutto
from 1 29,33 € 34,90 €
Prices plus shipping costs

Part number:
LT-1292



Target country of delivery

Amount


Limited stock

Currently available: 1 pcs.

Technical Data

Unit Value
Housing Color silver
 
Unit min. typ. max.
Voltage 27V
Current 2800mA

Downloads

Datasheet 538.48 KB

Description

Special edition with power factor compension (PFC)

High quality switching power supply with integrated noise filter and PFC to avaoid unintentional harmonics. Closed versions with screw clamps and very low periodic and random deviation. Overload protection, uto recovery and short circuit protection are (of curse) integrated, too.

This power supply is able to run hundrets of through hole LEDs with a very constant and high power output. If you have any questions regarding your own application just talk to our Support.

Technical Data:

- Type: Switching Power Supply with PFC
- Input: 85-264 VAC
- Input: 120-370 VDC
- Inrush Current: 30 A
- Output: 27 VDC
- Current: 2.8 A
- Overload Protection: yes
- Short Circuit Protection: yes
- Efficiancy: >80 %
- Tolerance: +/- 2%
- Ripple: 100 mV
- Length: 179 mm
- Width: 97 mm
- Height: 33 mm
- Connection: screw clamps

Delivery time

Deliveries within Germany take 2-3 days beginning after receipt of payment, for deliveries to invoice beginning with the shipment, for deliveries to cash on delivery beginning with receipt of order. Payments and incoming orders beyond our business hours let the delivery time begin with the next workday. For deliveries to other EU countries the delivery time may be extended up to 3 weeks. The delivery time is subject to the proper delivery of the logistics company, as far as delivery delays are not caused by us. The validity of the above delivery times requires the availability of the ordered goods from stock at the time the delivery time is beginning.