16x Samsung LM301B EVO on Stradella 16 in 3000K

CC module*

Varianten

UVP 4,90 €

Amount Netto Brutto
from 1 3,28 € 3,90 €
Prices plus shipping costs

Part number:
LT-6697



Target country of delivery

Amount

Technical Data

Unit Value
Light color warm-white
Beam 120°
Height 4.0mm
Width 49.49mm
Length 49.49mm
 
Unit min. typ. max.
Lumen 56lm 581lm 1643lm
PPF 0.79µMol/s 8.15µMol/s 22.99µMol/s
Kelvin 3000K
Voltage 2.57V 2.79V 3.06V
Current 100mA 1050mA 3200mA

Downloads

RoHS 444.37 KB
REACH 303.65 KB
Chemical Compatibility 723.42 KB

Description

16x Samsung LM301B EVO on Stradella 16 in 3000K

The Samsung LM301 is currently one of the most efficient LEDs on the market and exceeds the 200lm/W limit.

The Stradella 16 PCBs offer you completely new possibilities to realize demanding applications.

The advantages at a glance:

- easy installation
- high luminous flux
- individually stackable
- based on constant current
- 16x Samsung LEDs per board

- very good price / performance ratio
- optimized surface illumination, e.g. grow, advertising space

- d
rill hole for attaching the optics for M3 screws

- ATTENTION! For use with constant CURRENT only!

Current Voltage Power
0.100 A 2.57 V 0.26 W
0.350 A 2.65 V 0.93 W
0.700 A 2.73 V 1.91 W
1.050 A 2.79 V 2.93 W
1.400 A 2.85 V 3.99 W
1.750 A 2.88 V 5.04 W
2.100 A 2.94 V 6.17 W
2.800 A 3.02 V 8.46 W
3.200 A 3.06 V 9.79 W
Current Lumen Lumen/W
0.100 A 56 lm 215.38 lm/W
0.350 A 198 lm 212.90 lm/W
0.700 A 392 lm 205.24 lm/W
1.050 A 581 lm 198.29 lm/W
1.400 A 765 lm 191.73 lm/W
1.750 A 943 lm 187.10 lm/W
2.100 A 1120 lm 181.52 lm/W
2.800 A 1460 lm 172.58 lm/W
3.200 A 1643 lm 167.82 lm/W
Current µMol/s µMol/joule
0.100 A 0.79 3.04
0.350 A 2.78 2.99
0.700 A 5.50 2.88
1.050 A 8.15 2.78
1.400 A 10.72 2.69
1.750 A 13.21 2.62
2.100 A 15.67 2.54
2.800 A 20.43 2.41
3.200 A 22.99 2.35

The values shown in the table are averages of the 3000K modules.

Scope of delivery:

1x LT-6697 16x Samsung LM301B on Stradella 16 in 3000K
(Optic and heat sink are not included)


Successful usage of high power LEDs:

Heat management
Applications with high power LEDs need enduring, adequate and plane heat conduction from the first moment of use. It is very important and neccessary to get the heat off the devices to ensure the maximum light output, lifetime and efficiancy.

Drive management
LEDs should be run with a constant current in addition to the manufacturers recommendations. To ensure this we recommend to take constant current power supplies because resistors are always a risk factor in high power LED applications.

IP protection
Unless otherwise stated, the modules are not protected against high humidity or splashing water. If LEDs are used in areas that require increased protection, this must be manufactured according to the requirements.

EMC protection
LEDs are sensitive against heat and electric charge. Please avoid any kind of short circuits or electric discharge to the illuminant. The chip can be damaged or even destroyed.

Storage / JEDEC level
The storage temperature should be from -30°C up to + 80°C in dry ambience. After opening a sealed bag the content should be mounted rapidly. Once absorbed humidity can be removed by tempering the LEDs in some cases. More information can be found in the manufacturers datasheets or on the manufacturer homepages.

Soldering conditions
Each LED has its own soldering conditions that the user should pay attention to. After the launched lead free processing specifications many standarts have changed. Information about recommended soldering can be found in the manufacturers datasheets or on the manufacturer homepages.


Delivery time

Deliveries within Germany take 2-3 days beginning after receipt of payment, for deliveries to invoice beginning with the shipment, for deliveries to cash on delivery beginning with receipt of order. Payments and incoming orders beyond our business hours let the delivery time begin with the next workday. For deliveries to other EU countries the delivery time may be extended up to 3 weeks. The delivery time is subject to the proper delivery of the logistics company, as far as delivery delays are not caused by us. The validity of the above delivery times requires the availability of the ordered goods from stock at the time the delivery time is beginning.